Consider the following schedules:
S1: W2(x), W1(x), R3(x), R1(x), W2(y), R3(y), R3(z), R2(x)
S2: R3(z), W2(x), W2(y), R1(x), R3(x), R2(z), R3(y), W1(x)
S3: R2(z), W2(x), W2(y), W1(x), R1(x), R3(x), R3(z), R3(y)
Which one of the above schedules are conflict equivalent?