0 votes
197 views
A mason can complete a brick wall of size $10 \text{ ft.}$ high, $15  \text{ ft }$ wide using $9  \text{ inches}$ bricks in $3  \text{ days}$. How long will be take to make $4$ walls of size $10 \text{ ft}$ high, $5 \text{ ft}$ wide using $9  \text{ inches}$ bricks?
in Numerical Ability
recategorized by
197 views
0
Is the answer is 4 days?
0
I don't know.
Please explain...????

2 Answers

2 votes

Mason can complete a brick wall of size $10 \text{ ft.}$ high & $15 \text{ ft.}$ wide using $9 \text{ inches} $ bricks in $3 \text{ days.}$

So, Height of the wall = $10\text{ ft.}$ i.e. $10 \times 12\text{ inch}$ = $120\text{ inch}$

Width of the wall = $15\text{ ft.}$ i.e. $15 \times 12\text{ inch}$ = $180\text{ inch}$

∴ Mason completes $120 \times 180\text{ sq. inches}$ = $21600\text{ sq. inches}$ wall in $3 \text{ days}$

∴ In 1 day Mason build $\dfrac{21600}{3}$ = $7200 \text{ sq. inches}$ brick wall using $9\text{ inches}$ bricks.

Now, Mason needs to complete $4$ brick walls of size $10 \text{ ft.}$ high & $5 \text{ ft.}$ wide

Mason needs to complete $\{4 \times (10 \times 12) \times (5 \times 12)\} = 28800 \text{ sq. inches}$ wall.

∴ $\color{green}{\text{Mason needs} \left \{ \dfrac{28800}{7200} \right \}} = \color{gold}{4\text{ days}}$ $\color{green}{\text{to complete 28800  sq.inches wall using 9 inches brick}}$

Dimensions of bricks are not changing, so it didn't affect the results & we can compute the math in ft. also


edited by
2 votes

See my solution, any mistake let me know

Related questions

0 votes
2 answers
1
268 views
$A$ does half as much work as $B$ in three-fourths of the time. If together they take $18$ days to complete a work, how much time shall $A$ & $B$ take to do it individually ?
asked Feb 19, 2018 in Numerical Ability Dhanraj vishwakarma 268 views
0 votes
0 answers
2
279 views
Chandan and Falguni work on alternate days; Chandan working on the 1st day, Falguni on the 2nd, then Chandan again on the 3rd followed by Falguni on the 4th and so on. In this way, they can finish the work in 25 days. The work done by Chandan varies every day and on any ... days but my doubt is here asked is number of days so shouldn't we fill(answer) 55 instead of 54.25 as days cant be in decimal
asked Feb 1, 2019 in Numerical Ability Mayank Bansal 279 views
1 vote
2 answers
3
313 views
Three identical inlet pipes were opened at 6:00 AM to fill up an empty container. At 8:30 AM, 2 identical pipes (having different rate from existing pipe's rate) are also opened. At 9:30 AM, it still required 1 more hour for all these pipes to fill up ... which were added at 8:30 AM can individually fill up the empty container in 40 hours, then the capacity of the container is ____________ m3.
asked Jan 18, 2019 in Numerical Ability Shankar Kakde 313 views
5 votes
4 answers
4
1.4k views
Atul does half as much work as Anshu in $\dfrac 4 5$ of the time. If together they take $16$ days to complete the work, how many days shall Anshu take to do it? 23 25 26 30
asked Jan 10, 2016 in Numerical Ability bahirNaik 1.4k views
...