consider a system 1 with frequency 4GHz, Utkarsh runs a program designed to sort the integer in increasing order takes 10s to execute on this system. Utkarsh is designing a new system (system 2) to run the same program in 6sec.if increasing the clock rate will require 1.2 as many cycles for system 2,the clock rate of system 2 is ______________GHz.