Suppose there are $3$ jobs A, B and C arrive at approximately at the same time. But job A arrives slightly earlier than job B, and job B arrives alightly earlier than job C. Job A requires $2$ sec of CPU, Job B requires $8$ sec and job C requires $7$ sec. Assume time slice is of $1$ sec. Given Round Robin scheduler, what is the turn around time of job B?

  1. $1$ seconds
  2. $4$ seconds
  3. $16$ seconds
  4. $17$ seconds
recategorized by

1 Answer

0 votes
0 votes
B has the longeset CPU burst and with Robin Robin will finish after every other job finishes, which is $2+8+7=17$ seconds.