Consider an instruction pipeline with five stages without any branch prediction:

Fetch Instruction (FI), Decode Instruction (DI), Fetch Operand (FO), Execute Instruction (EI) and Write Operand (WO). The stage delays for FI, DI, FO, EI and WO are $\text{5 ns, 7 ns, 10 ns, 8 ns and 6 ns},$ respectively. There are intermediate storage buffers after each stage and the delay of each buffer is $1\ \text{ns}.$ A program consisting of $12$ instructions $\text{I1, I2, I3,}\ldots,\text{ I12}$ is executed in this pipelined processor. Instruction $\text{I4}$ is the only branch instruction and its branch target is $\text{I9}.$ If the branch is taken during the execution of this program, the time (in ns) needed to complete the program is

  1.  $132$   
  2.  $165$ 
  3.  $176$
  4.  $328$
edited by

9 Answers

Best answer
137 votes
137 votes
After pipelining we have to adjust the stage delays such that no stage will be waiting for another to ensure smooth pipelining (continuous flow). Since we can not easily decrease the stage delay, we can increase all the stage delays to the maximum delay possible. So, here maximum delay is $10$ ns. Buffer delay given is $1$ ns. So, each stage takes $11$ ns in total.

FI of $\text{I9}$ can start only after the EI of $\text{I4}.$ So, the total execution time will be
$$15 \times 11 = 165$$
$$\small \begin{array}{|c|c|c|c|c|c|c|c|c|c|c|c|c|c|c|c|} \hline
&\bf{t_1}&\bf{t_2}&\bf{t_3}&\bf{t_4}&\bf{t_5}&\bf{t_6}&\bf{t_7}&\bf{t_8}&\bf{t_9}&\bf{t_{10}}&\bf{t_{11}}&\bf{t_{12}}&\bf{t_{13}}&\bf{t_{14}}&\bf{t_{15}}\\
\hline
\textbf{I1}&\text{FI}&\text{DI}&\text{FO}&\text{EI}&\text{WO}\\
\textbf{I2}&&\text{FI}&\text{DI}&\text{FO}&\text{EI}&\text{WO}\\
\textbf{I3}&&&\text{FI}&\text{DI}&\text{FO}
&\text{EI}&\text{WO}\\
\textbf{I4}&&&&\text{FI}&\text{DI}&\text{FO}&\text{EI}&\text{WO}\\
&&&&&\color{red}{\text{stall}}\\
&&&&&&\color{red}{\text{stall}}\\
&&&&&&&\color{red}{\text{stall}}\\
\textbf{I9}&&&&&&&&\text{FI}&\text{DI}&\text{FO}&\text{EI}&\text{WO}\\
\textbf{I10}&&&&&&&&&\text{FI}&\text{DI}&\text{FO}&\text{EI}&\text{WO}\\
\textbf{I11}&&&&&&&&&&\text{FI}&\text{DI}&\text{FO}&\text{EI}&\text{WO}\\
\textbf{I12}&&&&&&&&&&&\text{FI}&\text{DI}&\text{FO}&\text{EI}&\text{WO}\\
\hline\end{array}$$

Correct Answer: $B$
edited by
33 votes
33 votes

answer = option B

cycles in pink are stall cycles, at EI-4 it was notified to the system that instruction 9 has to be loaded next. 
We have completed execution in a total of 15 cycles where each cycle was (10+1)ns long,

Hence, answer = $15 \times 11 = 165$ns

15 votes
15 votes
Clock Time = max stage delay + Buffer Delay

 = 10+1= 11ns

I1 - Finish at 5th clock

I2 - Finish at 6th clock

I3 - Finish at 7th clock

I4- Finish at 8th clock

Due to branching at I4 pipelining halts and starts after  EI stage of I4 and performs FI of I9 at 8th clock.

I9 - Finish at 12th clock

I10 - Finish at 13th clock

I11- Finish at 14th clock

I12 - Finish at 15 clock

Total time to complete program = 11*15= 165 ns
1 votes
1 votes
clock cycle time= max. stage delay+ buffer delay   

         = 10+1

         = 11 ns

clock cycle =15

execution time= 11*15=165
Answer: