If main memory access time is $400\;\mu s$, $TLB$ access time $50\;\mu s$, considering $TLB$ hit $90\%$, what wil be the overall access time?

  1. $800\;\mu s$
  2. $490 \;\mu s$
  3. $485\;\mu s$
  4. $450\;\mu s$
edited by

1 Answer

0 votes
0 votes

EMAT $=$ TLB hit $\times$ (TLB access time $+$ memory access time) $+$ TLB miss(TLB access time $+$ page table access time+memory access time)

$\implies$ EMAT $ = \dfrac{90}{100}(50+400) + \dfrac{10}{100}(50 + 400 + 400) \:\mu s$

$\implies $ EMAT $ = \dfrac{9}{10}(450) + \dfrac{1}{10}(850)\:\mu s$

$\implies $ EMAT $ = 9 \times 45 + 85 \:\mu s = 405 + 85 \:\mu s = 490\:\mu s.$

Ref: https://gateoverflow.in/2067/gate2014-3-33

So, the correct answer is $(B).$

Answer:

Related questions

3 votes
3 votes
4 answers
1
2 votes
2 votes
2 answers
2
gatecse asked Dec 9, 2020
730 views
Number of letter repeated in the given word $’MEASUREMENTS’$ are indicated in front of each alternative. Identify the correct alternative.$M_2E_2A_2S_2U_1R_1N_1T_1$$M...
2 votes
2 votes
1 answer
3
gatecse asked Dec 9, 2020
713 views
If $09/12/2001(DD/MM/YYYY)$ happens to be Sunday, then $09/12/1971$ would have been a:WednesdayTuesdaySaturdayThursday
2 votes
2 votes
2 answers
4
gatecse asked Dec 9, 2020
778 views
If a cube with length, height and width equal to $10\; cm$, is reduced to a smaller cube of height, length and width of $9\; cm$ then reduction in volume is :$172\;cm^3$$...