Answer is 12.
There are 2 load hazards which stalls the pipeline for 1 cycle each. There are 6 instructions hence total number of clock cycles to finish = 6 + 5 – 1 = 10.
Load hazards are
instruction pair (2, 3) and (4, 5)
Adding 2 stalls cycles we get 10 + 2 = 12.