search
Log In
Quick search syntax
tags tag:apple
author user:martin
title title:apple
content content:apple
exclude -tag:apple
force match +apple
views views:100
score score:10
answers answers:2
is accepted isaccepted:true
is closed isclosed:true
3 votes
1.1k views

Which one of the following assertions concerning code inspection and code walkthrough is true?

  1. Code inspection is carried out once the code has been unit tested
  2. Code inspection and code walkthrough are synonyms
  3. Adherence to coding standards is checked during code inspection
  4. Code walkthrough is usually carried out by an independent  test team
in IS&Software Engineering
retagged by
1.1k views
1
Sir,these are out of syllabus now.please tag it out of syllabus

2 Answers

3 votes
 
Best answer

c. 

Unit testing is not necessary before code inspection. Code walk through is done by a member of development team in presence of reviewers. So, a and d are false. 

http://nptel.ac.in/courses/106105087/pdf/m10L23.pdf

http://www.tutorialspoint.com/software_testing_dictionary/code_inspection.htm

0 votes
answer is a
Answer:

Related questions

4 votes
3 answers
1
1.4k views
Consider the basic COCOMO model where $E$ is the effort applied in person-months, $D$ is the development time in chronological months, $KLOC$ is the estimated number of delivered lines of code (in thousands) and $a_b, b_b, c_b, d_b$ have their useful meanings. The basic COCOMO equations are of the form ... $E=a_b exp(b_b), D=c_b (KLOC) exp(d_b)$ $E=a_b exp(d_b), D=c_b (KLOC) exp(b_b)$
asked Feb 12, 2015 in IS&Software Engineering jothee 1.4k views
4 votes
1 answer
2
1.2k views
A software requirements specification (SRS) document should avoid discussing which one of the following? User interface issues Non-functional requirements Design specification Interfaces with third party software
asked Feb 12, 2015 in IS&Software Engineering jothee 1.2k views
2 votes
1 answer
3
1.8k views
Consider a software program that is artificially seeded with 100 faults. While testing this program, 159 faults are detected, out of which 75 faults are from those artificially seeded faults. Assuming that both real and seeded faults are of same nature and have same distribution, the estimated number of undetected real faults is _______.
asked Feb 14, 2015 in IS&Software Engineering jothee 1.8k views
5 votes
2 answers
4
1.7k views
Match the following: (P) Condition Coverage (i) Black-box testing (Q) Equivalence class partitioning (ii) System testing (R) Volume testing (iii) White-box testing (S) Alpha testing (iv) Performance testing P - ii, Q - iii, R - i, S - iv P - iii, Q - iv, R - ii, S - i P - iii, Q - i, R - iv, S - ii P - iii, Q - i, R - ii, S - iv
asked Feb 11, 2015 in IS&Software Engineering makhdoom ghaya 1.7k views
...