455 views

1 Answer

0 votes
0 votes
Average instruction time for machine 1: CPI*Clock Cycle Time = 1*x

Average instruction time for machine 2: (1+40%*1)*(x/1.05)=1.3x

40%1 suggests that additional stall is occured due to structure hazard.

Therefore, machine 1 is faster
edited by

Related questions