search
Log In

Recent questions tagged software-metrics

1 vote
3 answers
1
The Functions Point (FP) metric is Calculated from user requirement Calculated from lines of code Calculated from software complexity assessment None of the above
asked Apr 22, 2018 in IS&Software Engineering Arjun 1.5k views
4 votes
1 answer
2
The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Jave is 50. Estimate teh effort (E) required to complete the project using the effort formula of basic COCOMO given: ... the values of a and b are 2.5 and 1.0 respectively 25 person months 75 person months 62.5 person months 72.5 person months
asked Aug 20, 2016 in IS&Software Engineering jothee 2.3k views
1 vote
2 answers
3
Which one of the following set of attributes should not be encompassed by effective software metrics ? Simple and computable Consistent and objective Consistent in the use of units and dimensions Programming language dependent
asked Jul 23, 2016 in IS&Software Engineering makhdoom ghaya 1k views
2 votes
3 answers
4
Which one of the following statements is incorrect? The number of regions corresponds to the cyclomatic complexity Cyclomatic complexity for a flow graph $G$ is $V(G)=N-E+2$, where E is the number of edges and N is the number of nodes in flow graph. Cyclomatic complexity for a flow ... for a flow graph $G$ is $V(G)=P+1$, where P is the number of predicate nodes contained in the flow graph G.
asked Jul 7, 2016 in IS&Software Engineering jothee 2.2k views
To see more, click for the full list of questions or popular tags.
...