0 votes
2
Which of the following is a $\text{EDI}$ standard ?$\text{ANSI X.15}$$\text{ANSI X.14}$$\text{ANSI X.13}$$\text{ANSI X.12}$
0 votes
3
Which activities is not included in the first pass of two pass assembler?build the symbol tableconstruct the Intermediate codeseparate memonic opcode and operand field.no...
1 votes
4
The number of different orders are possible for elements 1, 2, 3, 4, 5, 6, 7 to be inserted in to empty AVL tree such that no rotation will be done and element ‘4’ is...
0 votes
5
Which of the following tools is not required during system analysis phase of system development Life cycle ?CASE ToolRAD ToolReverse engineering toolNone of these
0 votes
6
Minimum number of individual shoes to be picked up from a dark room ( containing $10$ pair of shoes) if we have to get atleast one proper pair :$2$$20$$11$None of these
0 votes
7
What is the difference between recursive descent parser and ll(1) parser, since in both no left recursion and left factoring is allowed…..then what is the advantage of ...
0 votes
8
Every unambiguous grammar is LR(0) grammar?
0 votes
9
In transform analysis, input portion is called :Afferent branchEfferent branchCentral TransformNone of the above
0 votes
10
Code optimization is responsibility of :Application programmerSystem programmerOperating systemAll of the above
0 votes
11
What is the maximum counting speed of a $4$-bit binary counter which is composed of Flip-Flop with a propagation delay of $25\:ns$?$1 \text{MHz}$$10 \text{MHz}$$100 \text...
0 votes
12
0 votes
13
0 votes
14
0 votes
15
1 votes
18
Given two sorted list of size 'm' and 'n' respectively. The number of comparisons needed in the worst case by the merge sort algorithm will bem $\times$ nmax(m, n)min(m, ...
0 votes
19
0 votes
21
If the grammar has only S-attributed semantic definitions, in a top down parser we will add the semantic action at the end of production and it will we executed when we...
0 votes
22
__________ provide a method to recover data that has been delivered but not get used :SegmentationConcatenationTransalationSynchronization
0 votes
23
Which traversal techniques lists the nodes of a binary search tree in ascending order?post – orderin – orderpre – orderlinear – order
0 votes
24
Function over loading done at :RuntimeCompile timeLinking timeSwitching from function to function
0 votes
25
Sliding window concept of software project management is :Preparation of comprehenciable planPreparation of the various stages of developmentAd-hoc planningRequirement an...
0 votes
26
The end of an SQL command is denoted by :an end-of-line characteran ‘enter-key’ markerentering F4 keya semicolon (;)
0 votes
27
0 votes
28
What are best books solving questions in gate?plz suggest anybody along with the pdf….it’s highly required
0 votes
29
When an inventor is placed between both inputs of an $\text{S-R}$ flip flop, the resulting flip flop is :$JK$ flip-flop$D$ flip-flop$T$ flip-flopNone of these
0 votes
30
The mechanism with which several uses can share a medium without interference is :Frequency modulationAmplitude modulationMultiplexingNone of these