The time taken to execute a program in a non-pipelined machine is t. The same program is then executed on an m stage pipeline. The cost of all the logic stages of the pipeline is given by c and h is the cost of each latch. The delay incurred by each pipeline stage is d.
What is the expression for pipeline performance/cost ratio.