Recent questions and answers in IS&Software Engineering
0
0 votes
1
1 answer
144
144 views
ISRO CSE 2025 | Question: 78
Cyclomatic complexity is associated withWhite Box TestingBlack Box TestingGrey Box TestingNone of the above
Nakul2005
144
views
answered
5 hours
ago
IS&Software Engineering
isro-cse-2025
software-testing
is&software-engineering
+
–
0
0 votes
1
1 answer
144
144 views
ISRO CSE 2025 | Question: 79
Which of the following is related to Alpha Testing and Beta Testing?Unit TestingSystem TestingAcceptance TestingIntegration Testing
Nakul2005
144
views
answered
5 hours
ago
IS&Software Engineering
isro-cse-2025
is&software-engineering
software-testing
+
–
0
0 votes
1
1 answer
213
213 views
ISRO CSE 2025 | Question: 80
As per the Capability Maturity Model (CMM), the process maturity levels are defined asLevel $1$ : InitialLevel $2$ : $(A)$Level $3$ : $(B)$Level $4$ : $(C)$Level $5$ : Op...
Nakul2005
213
views
answered
5 hours
ago
IS&Software Engineering
isro-cse-2025
is&software-engineering
+
–
1
1 vote
3
answers
3 answers
7.1k
7.1k views
GATE IT 2005 | Question: 20
The Function Point (FP) calculated for a software project are often used to obtain an estimate of Lines of Code (LOC) required for that project. Which of the following st...
Mahargha_De
7.1k
views
answered
Sep 19
IS&Software Engineering
gateit-2005
is&software-engineering
function-point-metric
+
–
0
0 votes
1
1 answer
206
206 views
ISRO CSE 2025 | Question: 20
Considering, $\mathrm{X}$ is a function defined in a software project, following statements are madeFan-in is a measure of the number of functions that call the function,...
Kayden Cat
206
views
answered
Sep 15
IS&Software Engineering
isro-cse-2025
is&software-engineering
software-metrics
+
–
0
0 votes
1
1 answer
171
171 views
ISRO CSE 2025 | Question: 19
As per software engineering, which of the following order is correct for stages of Risk Management process of a software project?Risk identification $\rightarrow$ Risk pl...
Kayden Cat
171
views
answered
Sep 15
IS&Software Engineering
isro-cse-2025
is&software-engineering
+
–
0
0 votes
1
1 answer
361
361 views
UGC NET CSE | June 2025 | Part 2 | Question: 22
Which of the following is not a requirement elicitation TechniqueInterviewsThe use case approachFacilitated Application Specification Technique (FAST)Data Flow diagram
Keshvi 2
361
views
answered
Jun 21
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
+
–
0
0 votes
1
1 answer
183
183 views
UGC NET CSE | December 2025 | Part 2 | Question: 29
Match the $\textbf{LIST-I}$ with $\textbf{LIST-II}$LIST-ILIST-IIA.Class DiagramI.subsetB.Package diagramII.relationshipC.Object diagramIII.dependenciesD.Component diagram...
Keshvi 2
183
views
answered
May 26
IS&Software Engineering
ugcnetcse-dec2025
is&software-engineering
+
–
0
0 votes
0
0 answers
83
83 views
UGC NET CSE | December 2025 | Part 2 | Question: 87
Given below are two statements: one is labelled as Assertion A and the other is labelled as Reason RAssertion A: Higher cyclomatic complexity indicates a more complex pro...
Shubham Sharma 2
83
views
asked
Apr 19
IS&Software Engineering
ugcnetcse-dec2025
software-testing
cyclomatic-complexity
logical-reasoning
+
–
0
0 votes
0
0 answers
65
65 views
UGC NET CSE | December 2025 | Part 2 | Question: 88
Which of the following statements are correct regarding task elaboration in interface design.Alpha testing is done at the developer's site in a controlled environment.Bet...
Shubham Sharma 2
65
views
asked
Apr 19
IS&Software Engineering
ugcnetcse-dec2025
is&software-engineering
+
–
0
0 votes
0
0 answers
63
63 views
UGC NET CSE | December 2025 | Part 2 | Question: 89
Match the LIST-I with LIST-II LIST-I LIST-IIA.Content couplingI.Modifies internal data of another componentB.Control CouplingII.Pass control flag to influence logicC.Stam...
Shubham Sharma 2
63
views
asked
Apr 19
IS&Software Engineering
ugcnetcse-dec2025
is&software-engineering
software-design
logical-reasoning
+
–
0
0 votes
0
0 answers
62
62 views
UGC NET CSE | December 2025 | Part 2 | Question: 90
Match the LIST-I with LIST-II LIST-I LIST-IIA.V-ModelI.Trigger transitionB.Incremental process modelII.Classic life cycleC.Spiral ModelIII.Risk DrivenD.Concurrent ModelIV...
Shubham Sharma 2
62
views
asked
Apr 19
IS&Software Engineering
ugcnetcse-dec2025
is&software-engineering
software-design
+
–
1
1 vote
0
0 answers
100
100 views
Draw the NFA that recognizes the language where w contains the substring 0101. Do this using 5 states and assuming a binary alphabet.
Draw the NFA that recognizes the language where w contains the substring 0101. Do this using 5 statesand assuming a binary alphabet.
sadas_Musa_kane
100
views
asked
Apr 8
IS&Software Engineering
+
–
12
12 votes
6
answers
6 answers
9.5k
9.5k views
GATE CSE 2010 | Question: 44
The following program is to be tested for statement coverage:begin if (a==b) {S1; exit;} else if (c==d) {S2;} else {S3; exit;} S4; endThe test cases T1, T2, T3 and T4 giv...
Pranjal_Bhatt
9.5k
views
answered
Apr 3
IS&Software Engineering
gatecse-2010
is&software-engineering
software-testing
normal
out-of-gatecse-syllabus
+
–
1
1 vote
1
1 answer
194
194 views
NIELIT Scientific Assistant June 2025 | Question: 73
Which of the following phases in the Software Development Life Cycle $\text{(SDLC)}$ involves gathering and analyzing user requirements?DesignImplementationRequirement An...
emsaksham
194
views
answered
Mar 6
IS&Software Engineering
nielit-sta-2025
is&software-engineering
+
–
0
0 votes
1
1 answer
309
309 views
UGC NET CSE | August 2024 | Part 2 | Question: 10
If a software project has $2000$ lines of code (LOC) and the average productivity rate is $10$ LOC per person-hour, how many person-hours are required to complete the pro...
vxi lin
309
views
answered
Nov 18, 2025
IS&Software Engineering
ugcnetcse-aug2024
is&software-engineering
quantitative-aptitude
+
–
0
0 votes
1
1 answer
365
365 views
UGC NET CSE | January 2025 | Part 2 | Question: 53
In Software Engineering Jackson's Principle based onDesignationDefinitionsRefutable AssertionsFormal ReviewRequirement ElicitationChoose the correct answer from the optio...
Ramu Kumar
365
views
answered
Nov 14, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
+
–
0
0 votes
1
1 answer
294
294 views
UGC NET CSE | January 2025 | Part 2 | Question: 52
Identify the correct statements from the following regarding spiral model.Spiral model is an incremental process model.Spiral model is a risk - driven process mode.Spiral...
Ramu Kumar
294
views
answered
Nov 14, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
+
–
0
0 votes
0
0 answers
132
132 views
ISRO CSE 2025 | Question: 57
For a software project, following information about the domain characteristics are given:Sl NoDescriptionCountAverage Weight Factor$1$Number of user inputs$30$$4$$2$Numbe...
Shubham Sharma 2
132
views
asked
Nov 8, 2025
IS&Software Engineering
isro-cse-2025
software-engineering
software-metrics
+
–
0
0 votes
0
0 answers
158
158 views
ISRO CSE 2025 | Question: 77
In the V Model of Software Testing shown below, please identify $\text{(A), (B), (C), (D)}$:$\begin{array}{ll} \text{(A).} & \text{Acceptance Testing} \\ \text{(B).} & \t...
Shubham Sharma 2
158
views
asked
Nov 8, 2025
IS&Software Engineering
isro-cse-2025
is&software-engineering
software-testing
+
–
0
0 votes
1
1 answer
307
307 views
UGC NET CSE | January 2025 | Part 2 | Question: 47
Collaborative document inspection technique used for?Requirement Validation ProcessRequirement Verification ProcessIntegration TestingBlackbox Testing
Ash24
307
views
answered
Nov 6, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
+
–
0
0 votes
1
1 answer
296
296 views
UGC NET CSE | January 2025 | Part 2 | Question: 46
Which one of the following is the correct estimation model based on software equation?$\mathrm{E}=\left[\mathrm{LOC} \times \mathrm{B}^{0.222} / \mathrm{P}\right]^{2} \ti...
Ash24
296
views
answered
Nov 6, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
+
–
3
3 votes
2
2 answers
6.6k
6.6k views
ISRO CSE 2018 | Question: 47
In a particular program, it is found that $1$% of the code account for $50$% of the execution time. To code a program in C++, it takes $100$ man-days. Coding in assembly ...
goku4199
6.6k
views
answered
Oct 24, 2025
IS&Software Engineering
isro2018
is&software-engineering
+
–
0
0 votes
1
1 answer
577
577 views
UGC NET CSE | June 2025 | Part 2 | Question: 65
Which of the followings belongs to MaCall's quality factors?MaintainabilityUsabilityIntegrityFunctionalityChoose the correct answer from the options given below:$\text{I}...
Sandip_Pal
577
views
answered
Sep 26, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
+
–
0
0 votes
1
1 answer
1.2k
1.2k views
UGC NET CSE | June 2025 | Part 2 | Question: 64
Which of the following cohesions are better than the Procedural CohesionFunctional CohesionSequential CohesionTemporal CohesionCommunicational CohesionLogical CohesionCho...
Sandip_Pal
1.2k
views
answered
Sep 26, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
+
–
0
0 votes
1
1 answer
558
558 views
UGC NET CSE | June 2025 | Part 2 | Question: 47
Arrange the following in the increasing order of coupling from lowest coupling to highest coupling.Common CouplingStamp CouplingControl CouplingExternal CouplingContent C...
Sandip_Pal
558
views
answered
Sep 26, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
+
–
0
0 votes
1
1 answer
355
355 views
UGC NET CSE | June 2025 | Part 2 | Question: 48
Arrange the following types of testing in the order they are usually performed in the software Development life cycle.Integration testingUnit testingSystem TestingAccepta...
Sandip_Pal
355
views
answered
Sep 26, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
software-testing
+
–
1
1 vote
4
answers
4 answers
18.1k
18.1k views
GATE CSE 2009 | Question: 19
The coupling between different modules of a software is categorized as follows:Content couplingCommon couplingControl couplingStamp couplingData couplingCoupling between ...
rohitmewada947
18.1k
views
answered
Sep 20, 2025
IS&Software Engineering
gatecse-2009
is&software-engineering
normal
+
–
1
1 vote
1
1 answer
313
313 views
UGC NET CSE | June 2025 | Part 2 | Question: 24
The process followed in order to find difficult, unknown and hidden information about a software system is calledSoftware EngineeringSoftware Re-EngineeringReverse Engine...
mv_ind
313
views
answered
Sep 11, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
+
–
1
1 vote
1
1 answer
301
301 views
UGC NET CSE | June 2025 | Part 2 | Question: 25
Which of the followings is NOT a software characteristic?Software does not wear outSoftware is flexibleSoftware is not manufacturedSoftware is always correct
mv_ind
301
views
answered
Sep 10, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
+
–
0
0 votes
0
0 answers
238
238 views
UGC NET CSE | June 2025 | Part 2 | Question: 23
Estimation of software development effort for organic software in basic $\text{COCOMO}$ is$\mathrm{E}=2.4 (\mathrm{KLOC})^{1.05} \mathrm{PM}$$\mathrm{E}=3.4 (\mathrm{KLOC...
Shubham Sharma 2
238
views
asked
Sep 10, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
+
–
0
0 votes
0
0 answers
241
241 views
UGC NET CSE | June 2025 | Part 2 | Question: 83
Match List I with List II$\begin{array}{|ll|ll|} \hline \text{List I} & \text{(Software Quality} & \text{List II} & \text{(Description)} \\ & \text{Characteristic)} \\ \...
Shubham Sharma 2
241
views
asked
Sep 10, 2025
IS&Software Engineering
ugcnetcse-june2025
is&software-engineering
software-design
+
–
0
0 votes
0
0 answers
187
187 views
UGC NET CSE | June 2025 | Part 2 | Question: 84
Match List I with List II$\begin{array}{|ll|ll|} \hline &\textbf{List I} & & \textbf{List II} \\ \hline \text{A.} & \text{Equivalence Partitioning} & \text{I.} & \text{M...
Shubham Sharma 2
187
views
asked
Sep 10, 2025
IS&Software Engineering
ugcnetcse-june2025
software-testing
+
–
0
0 votes
0
0 answers
191
191 views
UGC NET CSE | January 2025 | Part 2 | Question: 48
Which one of the following is not the part of requirement management?Features Traceability TableDependency Traceability TableInterface Traceability TablePage Traceability...
Shubham Sharma 2
191
views
asked
Sep 10, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
+
–
0
0 votes
0
0 answers
208
208 views
UGC NET CSE | January 2025 | Part 2 | Question: 49
Software Testability is simply how easily a software program can be tested. Which one characteristics does not lead to testable software?ObservabilityControllabilityRepai...
Shubham Sharma 2
208
views
asked
Sep 10, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
software-testing
+
–
0
0 votes
0
0 answers
198
198 views
UGC NET CSE | January 2025 | Part 2 | Question: 50
Find the correct sequence of prototype software development model.StartDevelop PrototypeDeliver to customerQuick DesignQuick PlayChoose the correct answer from the option...
Shubham Sharma 2
198
views
asked
Sep 10, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
software-development-life-cycle-models
+
–
0
0 votes
0
0 answers
169
169 views
UGC NET CSE | January 2025 | Part 2 | Question: 51
As per the Software Engineering Institute (SEI), the correct sequence isInitialRepeatableManagedOptimizingDefinedChoose the correct answer from the options given below:$\...
Shubham Sharma 2
169
views
asked
Sep 10, 2025
IS&Software Engineering
ugcnetcse-jan2025
is&software-engineering
+
–
0
0 votes
1
1 answer
499
499 views
UGC NET CSE | June 2023 | Part 2: 54
Consider the following statements about the software product line system:Statement $\text{I}$: At the interaction level, components provide an operator display interface ...
Sandip_Pal
499
views
answered
Sep 9, 2025
IS&Software Engineering
ugcnetcse-june2023-paper2
is&software-engineering
software-design
+
–
0
0 votes
2
2 answers
631
631 views
UGC NET CSE | October 2022 | Part 1 | Question: 16
Fault base testing technique isUnit testingBeta testing,Stress testingMutation testing
Sandip_Pal
631
views
answered
Jul 3, 2025
IS&Software Engineering
ugcnetcse-oct2022-paper1
is&software-engineering
software-testing
+
–
0
0 votes
1
1 answer
332
332 views
UGC NET CSE | June 2008 | Part 2 | Question: 45
In clean room software engineering :only eco-friendly hardware is used.only hired facilities are used for development.correctness of the code is verified before testing.i...
GO Classes
332
views
answered
May 31, 2025
IS&Software Engineering
ugcnetcse-june2008-paper2
is&software-engineering
+
–
To see more, click for all the