Recent questions tagged is&software-engineering
1
votes
1
answer
211
UGC NET CSE | December 2015 | Part 3 | Question: 74
Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect? Requirement validation is one of the activities in the requirements phase. Prototyping is one of the methods ... the functional specifications. Function points is one of the most commonly used size metric for requirements.
Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect?“Requirement validation” is one of the activities in th...
Sankaranarayanan P.N
3.5k
views
Sankaranarayanan P.N
asked
Aug 2, 2016
IS&Software Engineering
ugcnetcse-dec2015-paper3
is&software-engineering
+
–
2
votes
2
answers
212
UGC NET CSE | Junet 2015 | Part 3 | Question: 60
Match the following : ... $\text{(a)-(iii), (b)-(i), (c)-(iv), (d)-(ii)}$
Match the following :$\begin{array}{clcl} & \textbf{List-I} & & \textbf{List-II} \\ \text{(a)} & \text{Joint Application} & \text{(i)} & \text{Delivers functionality in...
go_editor
1.6k
views
go_editor
asked
Aug 1, 2016
IS&Software Engineering
ugcnetcse-june2015-paper3
is&software-engineering
+
–
4
votes
1
answer
213
UGC NET CSE | Junet 2015 | Part 3 | Question: 48
A software design is highly modular if cohesion is functional and coupling is data type cohesion is coincidental and coupling is data type cohesion is sequential and coupling is content type cohesion is functional and coupling is stamp type
A software design is highly modular ifcohesion is functional and coupling is data typecohesion is coincidental and coupling is data typecohesion is sequential and couplin...
go_editor
2.5k
views
go_editor
asked
Aug 1, 2016
IS&Software Engineering
ugcnetcse-june2015-paper3
is&software-engineering
software-design
+
–
3
votes
1
answer
214
UGC NET CSE | Junet 2015 | Part 3 | Question: 47
A Design Concept Refinement is a Top-down approach Complementary of abstraction concept process of elaboration All of the above
A Design Concept Refinement is aTop-down approachComplementary of abstraction conceptprocess of elaborationAll of the above
go_editor
3.6k
views
go_editor
asked
Aug 1, 2016
IS&Software Engineering
ugcnetcse-june2015-paper3
software-design
is&software-engineering
+
–
4
votes
1
answer
215
UGC NET CSE | Junet 2015 | Part 3 | Question: 46
Adaptive maintenance is a maintenance which _____ correct errors that were not discovered till testing phase is carried out to port the existing software to a new environment improves the system performance both B and C
Adaptive maintenance is a maintenance which _____correct errors that were not discovered till testing phaseis carried out to port the existing software to a new environme...
go_editor
3.1k
views
go_editor
asked
Aug 1, 2016
IS&Software Engineering
ugcnetcse-june2015-paper3
software-maintenance
is&software-engineering
+
–
3
votes
1
answer
216
UGC NET CSE | Junet 2015 | Part 3 | Question: 42
Modulo design is used to maximize cohesion and minimize coupling. Which of the following is the key to implement this rule? Inheritance Polymorphism Encapsulation Abstraction
Modulo design is used to maximize cohesion and minimize coupling. Which of the following is the key to implement this rule?InheritancePolymorphismEncapsulationAbstractio...
go_editor
2.4k
views
go_editor
asked
Aug 1, 2016
IS&Software Engineering
ugcnetcse-june2015-paper3
software-design
is&software-engineering
+
–
1
votes
1
answer
217
UGC NET CSE | Junet 2015 | Part 2 | Question: 45
Which one from the following is highly associated activity of project planning? Keep track of the progress Compare the actual and planned progress and costs Identify the activities, milestones and deliverables produced by a project Both B and C
Which one from the following is highly associated activity of project planning?Keep track of the progressCompare the actual and planned progress and costsIdentify the act...
go_editor
3.0k
views
go_editor
asked
Jul 30, 2016
IS&Software Engineering
ugcnetcse-june2015-paper2
is&software-engineering
project-planning
+
–
0
votes
1
answer
218
UGC NET CSE | Junet 2015 | Part 2 | Question: 44
Cohesion is an extension of: Abstraction concept Refinment concept Information hiding concept Modularity
Cohesion is an extension of:Abstraction conceptRefinment conceptInformation hiding conceptModularity
go_editor
4.7k
views
go_editor
asked
Jul 30, 2016
IS&Software Engineering
ugcnetcse-june2015-paper2
is&software-engineering
cohesion
+
–
1
votes
3
answers
219
UGC NET CSE | Junet 2015 | Part 2 | Question: 43
Which process model is also called as classic life cycle model? Waterfall model RAD model Prototyping model Incremental model
Which process model is also called as classic life cycle model?Waterfall modelRAD modelPrototyping modelIncremental model
go_editor
2.8k
views
go_editor
asked
Jul 30, 2016
IS&Software Engineering
ugcnetcse-june2015-paper2
is&software-engineering
life-cycle-model
+
–
2
votes
1
answer
220
UGC NET CSE | Junet 2015 | Part 2 | Question: 42
Which of the testing strategy requirements established during requirements analysis are validated against developed software? validation testing integration testing regression testing system testing
Which of the testing strategy requirements established during requirements analysis are validated against developed software?validation testingintegration testingregressi...
go_editor
2.9k
views
go_editor
asked
Jul 30, 2016
IS&Software Engineering
ugcnetcse-june2015-paper2
software-testing
is&software-engineering
+
–
3
votes
1
answer
221
UGC NET CSE | Junet 2015 | Part 2 | Question: 41
Match the following: ... $a-iv, b-ii, c-iii, d-i$ $a-iii, b-i, c-iv, d-ii$
Match the following:$$\begin{array}{|ll|ll|} \hline \text{a.} & \text{Size-oriented} &i. & \text{uses number of external interfaces as one of} \\ &\text{metrics}&& \text{...
go_editor
1.8k
views
go_editor
asked
Jul 30, 2016
IS&Software Engineering
ugcnetcse-june2015-paper2
size-metrices
is&software-engineering
+
–
1
votes
1
answer
222
UGC NET CSE | December 2014 | Part 3 | Question: 48
Temporal cohesion means Coincidental cohesion Cohesion between temporary variables Cohesion between local variables Cohesion with respect to time
Temporal cohesion meansCoincidental cohesionCohesion between temporary variablesCohesion between local variables Cohesion with respect to time
makhdoom ghaya
4.1k
views
makhdoom ghaya
asked
Jul 29, 2016
IS&Software Engineering
ugcnetcse-dec2014-paper3
is&software-engineering
cohesion
+
–
2
votes
1
answer
223
UGC NET CSE | December 2014 | Part 3 | Question: 47
$'FAN IN'$ of a component $A$ is defined as Count of the number of components that can call, or pass control, to a component $A$ Number of components related to component $A$ Number of components dependent on component $A$ None of the above
$'FAN IN'$ of a component $A$ is defined as Count of the number of components that can call, or pass control, to a component $A$Number of components related to component ...
makhdoom ghaya
1.1k
views
makhdoom ghaya
asked
Jul 29, 2016
IS&Software Engineering
ugcnetcse-dec2014-paper3
is&software-engineering
fan-in
+
–
2
votes
1
answer
224
UGC NET CSE | December 2014 | Part 3 | Question: 46
Maximum possible value of reliability is $100$ $10$ $1$ $0$
Maximum possible value of reliability is$100$$10$$1$ $0$
makhdoom ghaya
2.7k
views
makhdoom ghaya
asked
Jul 29, 2016
IS&Software Engineering
ugcnetcse-dec2014-paper3
is&software-engineering
software-reliability
+
–
2
votes
1
answer
225
UGC NET CSE | December 2014 | Part 3 | Question: 45
Assume that the software team defines a project risk with $80$% probability of occurrence of risk in the following manner: Only $70$ percent of the software components scheduled for reuse will be integrated into the application and the remaining functionality ... $25,200 $20,160 $17,640 $15,120
Assume that the software team defines a project risk with $80$% probability of occurrence of risk in the following manner: Only $70$ percent of the software components sc...
makhdoom ghaya
8.4k
views
makhdoom ghaya
asked
Jul 29, 2016
IS&Software Engineering
ugcnetcse-dec2014-paper3
is&software-engineering
risk-management
+
–
3
votes
2
answers
226
UGC NET CSE | December 2014 | Part 3 | Question: 44
To compute function points $(FP)$, the following relationship is used $FP$ = Count - total $\times (0.65 + 0.01 \times \sum(F_{i}))$ where $F_{i} (i = 1$ to $n$) are value adjustment factors $(VAF)$ based on $n$ questions. The value of $n$ is $12$ $14$ $16$ $18$
To compute function points $(FP)$, the following relationship is used $FP$ = Count - total $\times (0.65 + 0.01 \times \sum(F_{i}))$ where $F_{i} (i = 1$ to $n$) are valu...
makhdoom ghaya
5.4k
views
makhdoom ghaya
asked
Jul 29, 2016
IS&Software Engineering
ugcnetcse-dec2014-paper3
is&software-engineering
function-point-metric
+
–
2
votes
2
answers
227
UGC NET CSE | December 2014 | Part 3 | Question: 43
Which one of the following is not a source code metric ? Halstead metric Function point metric Complexity metric Length metric
Which one of the following is not a source code metric ? Halstead metricFunction point metric Complexity metric Length metric
makhdoom ghaya
2.7k
views
makhdoom ghaya
asked
Jul 29, 2016
IS&Software Engineering
ugcnetcse-dec2014-paper3
is&software-engineering
source-code-metric
+
–
2
votes
1
answer
228
UGC NET CSE | December 2013 | Part 3 | Question: 9
Which of the following is not a software myth? Once we write the program and get it to work, our job is done Projects requirements continually change, but change can be easily accommodated because software is ... does not understand how to control software projects internally, it will invariably struggle when it outsources software projects.
Which of the following is not a software myth?Once we write the program and get it to work, our job is doneProjects requirements continually change, but change can be eas...
go_editor
3.4k
views
go_editor
asked
Jul 27, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper3
is&software-engineering
+
–
3
votes
1
answer
229
UGC NET CSE | December 2013 | Part 3 | Question: 8
One weakness of boundary value analysis and equivalence partitioning is they are not effective they do not explore combinations of input circumstances they explore combinations of input circumstances none of the above
One weakness of boundary value analysis and equivalence partitioning isthey are not effectivethey do not explore combinations of input circumstancesthey explore combinati...
go_editor
3.8k
views
go_editor
asked
Jul 27, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper3
is&software-engineering
software-testing
+
–
2
votes
1
answer
230
UGC NET CSE | December 2013 | Part 3 | Question: 7
A process which defines a series of tasks that have the following four primary objectives is known as to identify all items that collectively define the software configuration to manage changes to ... Software Quality Management Process Software Configuration Management Process Software Version Management Process Software Change Management Process
A process which defines a series of tasks that have the following four primary objectives is known asto identify all items that collectively define the software configura...
go_editor
1.6k
views
go_editor
asked
Jul 27, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper3
is&software-engineering
software-configuration
+
–
4
votes
1
answer
231
UGC NET CSE | December 2013 | Part 3 | Question: 6
Match the following $:$ ... $\text{a-ii, b-iii, c-iv, d-i}$ $\text{a-iii, b-ii, c-iv, d-i}$
Match the following $:$$\begin{array}{} & \textbf{List – I} && \textbf{List – II} \\ \text{a.} & \text{Data Coupling} & \text{i. }& \text{Module A and Module B have ...
go_editor
3.1k
views
go_editor
asked
Jul 27, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper3
is&software-engineering
coupling
+
–
2
votes
2
answers
232
UGC NET CSE | December 2013 | Part 3 | Question: 5
Function points can be calculated by UFP * CAF UFP * FAC UFP * Cost UFP * Productivity
Function points can be calculated byUFP * CAFUFP * FACUFP * CostUFP * Productivity
go_editor
5.0k
views
go_editor
asked
Jul 27, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper3
is&software-engineering
cost-estimation-model
+
–
1
votes
2
answers
233
UGC NET CSE | December 2013 | Part 2 | Question: 10
Testing of software with actual data and in actual environment is called Alpha testing Beta testing Regression testing None of the above
Testing of software with actual data and in actual environment is calledAlpha testingBeta testingRegression testingNone of the above
go_editor
12.4k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper2
is&software-engineering
+
–
1
votes
1
answer
234
UGC NET CSE | December 2013 | Part 2 | Question: 9
Which one of the following is not a step of requirement engineering? Requirement elicitation Requirement analysis Requirement design Requirement documentation
Which one of the following is not a step of requirement engineering?Requirement elicitationRequirement analysisRequirement designRequirement documentation
go_editor
2.6k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper2
is&software-engineering
+
–
1
votes
1
answer
235
UGC NET CSE | December 2013 | Part 2 | Question: 8
Software Configuration Management is the discipline for systematically controlling the changes due to the evolution of work products as the project proceeds the changes due to defects (bugs) being found and then fixed the changes due to requirement changes all of the above
Software Configuration Management is the discipline for systematically controllingthe changes due to the evolution of work products as the project proceedsthe changes due...
go_editor
2.9k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper2
is&software-engineering
+
–
1
votes
1
answer
236
UGC NET CSE | December 2013 | Part 2 | Question: 7
The relationship of data elements in a module is called Coupling Modularity Cohesion Granularity
The relationship of data elements in a module is calledCouplingModularityCohesionGranularity
go_editor
6.4k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-dec2013-paper2
is&software-engineering
+
–
1
votes
1
answer
237
UGC NET CSE | September 2013 | Part 3 | Question: 50
Sixty reusable components were available for an application. If only 70% of these components can be used, rest 30% would have to be developed from scratch. If average component is 100 LOC and cost of each LOC is Rs. 14, what will be risk of exposure if risk probability is 80%? Rs. 25, 200 Rs. 20, 160 Rs. 25, 160 Rs. 20, 400
Sixty reusable components were available for an application. If only 70% of these components can be used, rest 30% would have to be developed from scratch. If average com...
go_editor
2.6k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-sep2013-paper3
is&software-engineering
risk-management
+
–
2
votes
1
answer
238
UGC NET CSE | September 2013 | Part 3 | Question: 46
In _____, modules A and B make use of a common data type, but perhaps perform different operations on it. Data coupling Stamp coupling Control coupling Content coupling
In _____, modules A and B make use of a common data type, but perhaps perform different operations on it.Data couplingStamp couplingControl couplingContent coupling
go_editor
3.1k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-sep2013-paper3
is&software-engineering
coupling
+
–
0
votes
1
answer
239
UGC NET CSE | September 2013 | Part 3 | Question: 45
Improving processing efficiency or performance or restructuring of software to improve changeability is known as Corrective maintenance Perfective maintenance Adaptive maintenance Code maintenance
Improving processing efficiency or performance or restructuring of software to improve changeability is known asCorrective maintenancePerfective maintenanceAdaptive maint...
go_editor
3.3k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-sep2013-paper3
is&software-engineering
software-maintenance
+
–
0
votes
1
answer
240
UGC NET CSE | September 2013 | Part 3 | Question: 44
The failure intensity for a basic model as a function of failures experienced is given as $\lambda (\mu) - \lambda_0[1-(\mu)/(V_0)]$ where $\lambda_0$ is the initial failure intensity at the start of the execution, $\mu$ is the average or ... of failures intensity per failure will be 10 per CPU hr 0.1 per CPU hr -0.1 per CPU hr 90 per CPU hr
The failure intensity for a basic model as a function of failures experienced is given as $\lambda (\mu) - \lambda_0[1-(\mu)/(V_0)]$ where $\lambda_0$ is the initial fail...
go_editor
2.8k
views
go_editor
asked
Jul 24, 2016
IS&Software Engineering
ugcnetcse-sep2013-paper3
is&software-engineering
software-reliability
+
–
Page:
« prev
1
...
3
4
5
6
7
8
9
10
11
12
13
next »
Email or Username
Show
Hide
Password
I forgot my password
Remember
Log in
Register