For the processes listed in the following table, which of the following scheduling schemes will give the lowest average turnaround time?$$\small \begin{array}{|c|c|c|} \hline \textbf{Process} & \textbf{Arrival Time} & \textbf{Process Time}\\\hline \text{A} & 0 & 3 \\\hline \text{B} & 1 & 6  \\\hline \text{C} & 4 & 4 \\\hline \text{D} & 6 & 2 \\\hline  \end{array}$$

  1. First Come First Serve
  2. Non-preemptive Shortest job first
  3. Shortest Remaining Time
  4. Round Robin with Quantum value two

8 Answers

Best answer
66 66 votes

Turn Around Time $=$ Completion Time  $-$ Arrival Time

FCFS

Average turn around time $ = [3 \ \text{for A} + (2 + 6) \ \text{for B} + (5 + 4) \ \text{for C} + (7 + 2) \ \text{for D}] / 4 = 7.25$

Non-preemptive Shortest Job First 

Average turn around time $= [3  \ \text{ for A} + (2 + 6) \ \text{for B} + (3 + 2) \ \text{for D}+ (7 + 4)  \ \text{ for C}] = 6.75$

Shortest Remaining Time

Average turn around time $= [3 \ \text{for A } + (2 + 1) \ \text{ for B }+ (0 + 4) \ \text{ for C} + (2 + 2) \ \text{ for D} + (6 + 5)  \ \text{ for remaining B } ]/4 = 6.25$

Round Robin

Average turn around time $=$

$[2 \ \text{ for A (B comes after 1)}$
$+ (1 + 2)  \ \text{ for B {C comes}}$
$+ (2+1) \ \text{for A (A finishes after 3 cycles with turnaround time of} \ 2 + 3 = 5)$
$+ (1+2) \ \text{for C \{D comes\}}$
$+ (3+2) \ \text{ for B}$
$+ (3+2) \ \text{ for D (D finishes with turnaround time of } 3+2 = 5)$
$+  (4+2)  \ \text{ for C (C finishes with turnaround time of } 3 + 6 = 9)$
$+ (4+2)  \ \text{ for B (B finishes after turnaround time of } 3 + 5 + 6 = 14]$
$/4$
$= 8.25$


Shortest Remaining Time First scheduling which is the preemptive version of the SJF scheduling is provably optimal for the shortest waiting time and hence always gives the best (minimal) turn around time (waiting time $+$ burst time). So, we can directly give the answer here.

Correct Answer: $C$

• edited by
23 23 votes

TAT = Completion Time - arrival time 

First Come First Serve

0 A  3 3  B  9 9  C  13  13  D  15

TAT : for A ( 3-0) = 3 

for B (9 - 1) = 8

for C ( 13 - 4) = 9

for D (15 - 6) = 9

so Avg TAT = (3+8+9+9 ) / 4 =  29 /4 = 7.25  for FCFS .

--------------

Round Robin with Quantum value two

0  A  2 2  B  4 4  A  5 5  C  7 7  B  9 9  D  11  11  C  13 13  B  15

In RR after preemption a process go to end of that FIFO queue , so here first A is in queue then at time 1 B comes , time quantum is 2 so after 2 A is preempted then A go to end of queue after B as in queue only A and B is there . Now B continue till 4 then at that time C is in queue so B goes after C . As A was after B so when B preempted at 4 that time A starts and completes at 5 then C comes and at 7 C completes . At this point D arrive and go to after B in queue . Next B continue and C goes after D . B continue  till 9 then D starts and go to till 11 . Then again C comes and complete at 13 at last element of queue is B it completes rest at 15.

so the order in queue is like this A B A C B D C B 

Avg TAT = { ( 5-0) + (15-1) + (13-4) + (11 - 6) } / 4 = 5+14+9+5 / 4 = 33/4 = 8.25 

------------

Shortest Remaining Time  (SRTF)

0  A   3 3  B  4 4 C  8 8  D  10 10  B  15

A start at 0 then at 1 B comes but A have remaining time 2 and B have remaining time 5 so 2<5 and A continues till 3 , then B starts at 4 C comes , remaining time for B is 5 and C is 4 as 4<5 so C starts at 6 D comes , remaining time for B is 5 and 5>2 and for C remain is 2 , 2 = 2 so C continues after that D comes and at last B completes .

Avg TAT is = { (3-0) + (15-1)+(8-4) + (10-6) } / 4 =  (3+14+4+4) / 4 = 25/4 = 6.25

---------------

Non-preemprive Shortest job first  ( SJF)

0  A  3 3  B  9 9  D  11 11 C  15

Avg TAT = { (3-0) + (9-1)+ (15-4) + (11- 6) } / 4 = (3+8+11+5) / 4 =  27/4 = 6.75

so we can see , Avg TAT  for  FCFS = 7.25 ,  SJF = 6.75 ,   SRTF = 6.25   and   RR = 8.25   .

SRTF is less among them hence answer is option C .

19 19 votes

Average Turn around time=$\sum_{i=1}^n\frac{Burst Time_i+Waiting Time_i+Time\,doing\,I/O_i}{n}$

where n=Number of processes in the system.

Assuming all processes are completely CPU bound, for all processes $Time\,I/O=0$

Since, average of Burst time overall process would come to be same irrespective of the scheduling algorithm followed,

My Average turn around time depends directly proportional to the Waiting time of each process.

And below is a snapshot from galvin

Below an example from Galvin, proves an observation: Avg waiting time of preemptive SJF is less than that of non-preemptive SJF.

 

And among all scheduling algorithms, SJF is optimal indeed.

So, among all the options given, Shortest Remaining Time(Preemptive SJF) would minimum average waiting time for all the processes and hence average turn around time compared to others will be low.

Clearly, answer is (C)

7 7 votes

Turn around time is Amount of time taken to complete a particular process. ie 

=> Process Completion Time-Process Arrival Time

Average Turn Around Time (TA) for FCFS will be

=[TA(A)+TA(B)+TA(C)+TA(D)]/4

[(3-0)+(9-1)+(13-4)+(15-6)]/4=7.25

Average Turn Around Time (TA) for SJF will be

=[TA(A)+TA(B)+TA(C)+TA(D)]/4

(3+8+5+11)/4=6.75

Average Turn Around Time (TA) for SRTF will be

=[TA(A)+TA(B)+TA(C)+TA(D)]/4

[(3-0)+(15-1)+(8-4)+(10-6)]/4=6.25 

Average Turn Around Time (TA) for RR with time quanta 2 will be 

=[TA(A)+TA(B)+TA(C)+TA(D)]/4

A B A C B D C B

0           2                4               5               7                9              11               13              15

[(5-0)+(15-1)+(13-4)+(11-6)] /4=( 5+14+9+5)/4

=>33/4=8.25

If we consider non preemptive Round Robin then Gantt Chart will be

0            2               4                6               8        9       10          12               14           16

A B C D A - B C B

Average Turn Around Time Will be

[(9-0)+(16-1)+(14-4)+(8-6)]/4=36/4=>9

So, Lowest Turn Around Time Will be in case of SRTF.

 
 
 
• edited by
3 3 votes

Directly Answer:

SRTF is the pre-emptive version of SJF which will always give the minimal wait time. So directly answer C.

Why SJF is Optimal?

Consider two processes

  Execution Time
P1 2
P2 5

 

if P1 executes first,

$\Rightarrow$ P2 will have to wait till P1 Completes

$\Rightarrow$ That is 2 unit of time.

if P2 executes first,

$\Rightarrow$ P1 will have to wait till P2 Completes

$\Rightarrow$ That is 5 unit of time.

Better to execute shortest ones first so that others will have to wait till shorter execution times. 

 

1 1 vote
Here the correct option would be option C- shortest remaining time and not SJF.

The main confusion is why SRTF and not SJF? Well if the arrival time is same both SRTF and SJF gives the minimum average waiting time but when the arrival time is different like in this case, the preemptive scheduling algo has advantage over non preemptive one and hence lower waiting time .  So we can directly say SRTF waiting time < SJF waiting time for processes that are premptive and having different arrival time otherwise its the same for arrival time =0 .
Answer:
Position:
Show:

Related questions

54 54 votes
7 answers 7 answers
40.7k
40.7k views
go_editor asked Feb 14, 2015
40,744 views
The maximum number of processes that can be in $\textit{Ready}$ state for a computer system with $n$ CPUs is :$n$$n^2$$2^n$Independent of $n$
51 51 votes
5 answers 5 answers
21.0k
21.0k views
go_editor asked Feb 16, 2015
21,028 views
Consider the following policies for preventing deadlock in a system with mutually exclusive resources.Process should acquire all their resources at the beginning of execu...
103 103 votes
7 answers 7 answers
39.7k
39.7k views
go_editor asked Feb 14, 2015
39,716 views
Two processes $X$ and $Y$ need to access a critical section. Consider the following synchronization construct used by both the processes$$\begin{array}{|l|l|}\hline \text...
8 8 votes
4 answers 4 answers
8.4k
8.4k views
go_editor asked Feb 16, 2015
8,390 views
Consider the following software items: Program-$X$, Control Flow Diagram of Program-$Y$ and Control Flow Diagram of Program-$Z$ as shown belowThe values of McCabe's Cyclo...