0 0 votes Consider the following track requests in the disk queue: 95, 180, 34, 119, 11, 123, 62, 64 The C-scan scheduling algorithm is used and the read/write head is positioned at location 50. If tracks are numbered from 0 to 199 and head moving toward smaller track number on its servicing pass, then total seek time needed with 2 msec time to move from one track to another while servicing these requests is ________ msec. [Assume moving from one end to another end will take 10 msec] Operating System disk-scheduling operating-system + – Na462 6.4k views answer comment Share Follow Print See 1 comment 1 1 comment reply Brij Mohan Gupta commented Aug 6, 2018 reply Follow flag Total Head movement from 50 to 0 = 50 and 199 to 62 137 and switch time from track 0 to track 199 = 10msec so total time is 50*2 +137*2+10 = 384. More Ref :- http://www.cs.iit.edu/~cs561/cs450/disksched/disksched.html 0 0 replyShare Please log in or register to add a comment.
3 3 votes Total Head movement from 50 to 0 = 50 and 199 to 62 137 and switch time from track 0 to track 199 = 10msec so total time is 50*2 +137*2+10 = 384. More Ref :- http://www.cs.iit.edu/~cs561/cs450/disksched/disksched.html Brij Mohan Gupta answered Aug 6, 2018 Brij Mohan Gupta comment Share Follow See 1 comment 1 1 comment reply Ritik Jain RJ commented Oct 19, 2018 reply Follow flag why multiply with 2 0 0 replyShare Please log in or register to add a comment.
0 0 votes in the question they given that, " head moving toward smaller track number on its servicing pass " current head is 50 ==> move 34 then 11 then 0 ---> circular ---> at 199 with cost (50+10 = 60) ---> come up to 62 ( 199-62 = 137) total movements = 60+137 = 197 total seek time = 197 * 2 msec = 394ms Shaik Masthan answered Jul 9, 2018 Shaik Masthan comment Share Follow 0 reply Please log in or register to add a comment.