4,174 views
3 3 votes

Consider a System using Round Robin scheduling with 10 Processes all arriving at the time 0. Each Process is associated with 20 identical Request. Each Process request consumes 20 ms of CPU time after which it spends 10 ms of time on I/O,thereafter intiates subsequent Request. Assuming scheduling Overhead of 2 ms and Time Quantum of 20 ms, Calculate

i. Response time of the 1st Request of the 1st Process.

ii. Response time of the 1st Request of the last Process.

iii. Response time of the subsequent request of any process.

3 Answers

2 2 votes
response time of first request=2ms.

response time of 1st request of the last process=9*(20+2)+2=200ms.
0 0 votes

response time of first request of first process=2+20=22ms

Response time of first request of last process =(2+20)*10=220ms

Response time of subsequent request of any process=10+210=220ms

 

Position:
Show:

Related questions

0 0 votes
1 1 answer
2.7k
2.7k views
anupamsworld asked Jun 6, 2022
2,678 views
Lets consider one situation where,OS is scheduling processes(P1,P2,P3...Pn) with Round Robin method and current running process is P1 and next scheduled process in queue ...
8 8 votes
6 answers 6 answers
6.9k
6.9k views
rahul sharma 5 asked Aug 26, 2017
6,850 views
If we have only one process in ready queue with burst time "m", then how many context switching will happen using round robing scheduling with time quantum q ,where q<m.A...
0 0 votes
1 1 answer
1.6k
1.6k views
Parshu gate asked Dec 10, 2017
1,621 views
Choose correct answer from the below options:If the following jobs are to be executed on a single processor systemThe jobs are arrived at time 0 and in the order a, b, c,...
1 1 vote
2 answers 2 answers
1.8k
1.8k views
BhavdeepSinghNijhawa asked Jan 27, 2025
1,759 views
 Option D) has been given as a correct option in the MSQ question but why the E's (arrival time = 4ms) turn was not placed after D?